[Mufn-1077] Late 1077 for Project 1204-05-02/72 Dodgeville - Mt Horeb (USH 151 to E County Line), USH 18, Iowa County
Kozol, Deborah - DOT
Deborah.Kozol at dot.wi.gov
Tue Feb 14 09:48:22 CST 2017
Pat,
I need a 1077 from MUFN for this project.
UW Madison does not show up in our database for this project. I received a Dane Co. spatial map (attached), system map and 1077 for project 1204-08-63 on USH 18 in Dane Co. Do you have facilities in Iowa Co.? If so, please fill out the attached Iowa Map and I will send a 1077 to you.
Thanks!
Debby
From: Patrick Christian [mailto:patrick.christian at wisc.edu]
Sent: Tuesday, February 14, 2017 9:20 AM
To: Kozol, Deborah - DOT <Deborah.Kozol at dot.wi.gov>; 'King, Herbert' <HKing at cityofmadison.com>
Cc: 'MUFN-1077 at lists.mufn.org' <MUFN-1077 at lists.mufn.org>; Kronberger, Paul <pkronberger at cityofmadison.com>
Subject: RE: Late 1077 for Project 1204-05-02/72 Dodgeville - Mt Horeb (USH 151 to E County Line), USH 18, Iowa County
Debby,
This one belongs in UW-Madison's court. There's no response from the City on this one.
My engineers said they responded to this about 6 weeks ago. What documents are we missing here?
Thanks,
Pat
Thanks,
Patrick L. Christian
Asst. Director, Network Services
UW-Madison Division of IT (DoIT)
1210 W. Datyon St
Madison, WI 53706
Desk (w/ V-mail): 608.265.9699
Cell: 608.516.3264
Fax: 608.262.4679
patrick.christian at doit.wisc.edu<mailto:patrick.christian at doit.wisc.edu>
Let's go RED ... and ON Wisconsin!!!
From: Mufn-1077 [mailto:mufn-1077-bounces at lists.mufn.org] On Behalf Of Kozol, Deborah - DOT
Sent: Tuesday, February 14, 2017 9:00 AM
To: 'King, Herbert' <HKing at cityofmadison.com<mailto:HKing at cityofmadison.com>>
Cc: 'MUFN-1077 at lists.mufn.org' <MUFN-1077 at lists.mufn.org<mailto:MUFN-1077 at lists.mufn.org>>; Kronberger, Paul <pkronberger at cityofmadison.com<mailto:pkronberger at cityofmadison.com>>
Subject: [Mufn-1077] FW: Late 1077 for Project 1204-05-02/72 Dodgeville - Mt Horeb (USH 151 to E County Line), USH 18, Iowa County
Importance: High
Hi Herbert,
Did I miss your response? Please respond as soon as possible since this request is two months old.
Thanks so much.
Debby
From: Kozol, Deborah - DOT
Sent: Monday, February 06, 2017 9:13 AM
To: 'hking at cityofmadison.com' <hking at cityofmadison.com<mailto:hking at cityofmadison.com>>
Cc: Kronberger, Paul <pkronberger at cityofmadison.com<mailto:pkronberger at cityofmadison.com>>; 'MUFN-1077 at lists.mufn.org' <MUFN-1077 at lists.mufn.org<mailto:MUFN-1077 at lists.mufn.org>>
Subject: FW: Late 1077 for Project 1204-05-02/72 Dodgeville - Mt Horeb (USH 151 to E County Line), USH 18, Iowa County
Hi Herb,
Paul mentioned you are the new contact. Please respond as soon as possible. Thanks!
Debby
From: Kozol, Deborah - DOT
Sent: Thursday, December 08, 2016 1:15 PM
To: Kronberger, Paul
Subject: Late 1077 for Project 1204-05-02/72 Dodgeville - Mt Horeb (USH 151 to E County Line), USH 18, Iowa County
Dear Paul,
Due to spatial updates, your facility is now listed in the database for this project. I am sending a cover letter and 1077 for this project. Please respond as soon as possible. Thanks so much!
Until your contact information is changed in the database, I will try to change the forms to your contact info.
The purpose of the project is to patch and overlay the existing pavement surface that has exceeded its service life. The project begins near the USH 151 interchange and extends northeast approximately 14.43 miles to the east county line of Iowa County. Proposed improvements include overlaying the travel lanes and paved shoulders with 4.25-inches of Hot Mix Asphalt (HMA) at the centerline and 3.5-inches of HMA at the edge of pavement. Right-of-way acquisition is not expected and wetlands will not be impacted. Construction of the project is scheduled for 2018, but may be advanced to 2017.
Additional USH 18 roadway improvements include the following:
1. Upgrade select intersections to current geometric standards (to be determined during preliminary design).
2. Replacement of existing beam guard and turn-down terminal ends to current standards.
3. Protection of existing roadside hazards within the roadway clear zone (i.e. steep slopes, non-traversable slopes, fixed objects).
4. Replacement of select culvert pipes (as identified by WisDOT Maintenance).
5. Replacement of existing signing and pavement markings to current standards.
6. Concrete deck overlay on bridge B-25-38 and two wing replacements.
Attachments included:
Cover Letter
DT1077 Notice/Acknowledgement Form
Concept Definition Report
1078 Utility Contact List
Debby Kozol P.E.
WisDOT/DTSD
SW Region Madison Utility Coordinator
Iowa, Lafayette, Green and Rock Counties
2101 Wright St.
Madison, WI 53704-2583
608-243-3372
608- 516-7845 Cell
deborah.kozol at dot.wi.gov<mailto:deborah.kozol at dot.wi.gov>
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.mufn.org/pipermail/mufn-1077/attachments/20170214/51dae53a/attachment-0001.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: UW Madison PLSS Utility grid 2017-01-03.pdf
Type: application/pdf
Size: 428697 bytes
Desc: UW Madison PLSS Utility grid 2017-01-03.pdf
URL: <http://lists.mufn.org/pipermail/mufn-1077/attachments/20170214/51dae53a/attachment-0002.pdf>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: LafayetteIowa.pdf
Type: application/pdf
Size: 582991 bytes
Desc: LafayetteIowa.pdf
URL: <http://lists.mufn.org/pipermail/mufn-1077/attachments/20170214/51dae53a/attachment-0003.pdf>